{"id":1561,"date":"2025-05-07T10:31:31","date_gmt":"2025-05-07T08:31:31","guid":{"rendered":"https:\/\/trevigroupstg.wpenginepowered.com\/en\/media-gallery\/chacao-bridge-project-pila-norte-mastering-the-task\/"},"modified":"2025-05-30T15:18:10","modified_gmt":"2025-05-30T13:18:10","slug":"chacao-bridge-project-pila-norte-mastering-the-task","status":"publish","type":"media_gallery","link":"https:\/\/www.trevigroup.com\/en\/media-gallery\/chacao-bridge-project-pila-norte-mastering-the-task\/","title":{"rendered":"CHACAO BRIDGE PROJECT &#8211; PILA NORTE &#8211; MASTERING THE TASK"},"content":{"rendered":"\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p>The <strong>North Pier<\/strong> is one of the three of the <strong>Puente Chacao project<\/strong> in Chile; this pier consists of 18 piles, 9 per two blocks.<br>For this pier, t<strong>wo types of technologies were adopted for the first time in Chile<\/strong>: firstly, the insertion and driving of casings with a diameter of 2650 mm, with a total length of 59 m and a total weight of 180 tons. The second technology adopted for the excavation of the piles was reverse circulation with Wirth, using polymers, for a total length of 90m.<br>This was certainly a very important challenge for <strong>Trevi<\/strong>; remarkable goals were achieved, meeting a tight schedule, demonstrating once again the technical and organisational skills that distinguish our way of tackling the most demanding challenges, even during a global pandemic.<\/p>\n\n\n<div class=\"saz-embed-youtube embed-responsive embed-responsive-16by9\"><!-- IUB-COOKIE-BLOCK-SKIP-START --><iframe loading=\"lazy\" class=\"embed-responsive-item _iub_cs_skip\" width=\"940\" height=\"529\" src=\"https:\/\/www.youtube-nocookie.com\/embed\/EH85gr79Vw0?rel=0&amp;showinfo=0&amp;autoplay=0&amp;controls=1\" allow=\"autoplay; encrypted-media\" webkitallowfullscreen mozallowfullscreen allowfullscreen><\/iframe><!-- IUB-COOKIE-BLOCK-SKIP-END --><\/div>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The North Pier is one of the three of the Puente Chacao project in Chile; this pier consists of 18 piles, 9 per two blocks.For this pier, two types of technologies were adopted for the first time in Chile: firstly, the insertion and driving of casings with a diameter of 2650 mm, with a total [&hellip;]<\/p>\n","protected":false},"featured_media":1562,"menu_order":40,"template":"","tipologia":[11],"class_list":["post-1561","media_gallery","type-media_gallery","status-publish","has-post-thumbnail","hentry","tipologia-video-gallery"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.trevigroup.com\/en\/wp-json\/wp\/v2\/media_gallery\/1561","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.trevigroup.com\/en\/wp-json\/wp\/v2\/media_gallery"}],"about":[{"href":"https:\/\/www.trevigroup.com\/en\/wp-json\/wp\/v2\/types\/media_gallery"}],"version-history":[{"count":0,"href":"https:\/\/www.trevigroup.com\/en\/wp-json\/wp\/v2\/media_gallery\/1561\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.trevigroup.com\/en\/wp-json\/wp\/v2\/media\/1562"}],"wp:attachment":[{"href":"https:\/\/www.trevigroup.com\/en\/wp-json\/wp\/v2\/media?parent=1561"}],"wp:term":[{"taxonomy":"tipologia","embeddable":true,"href":"https:\/\/www.trevigroup.com\/en\/wp-json\/wp\/v2\/tipologia?post=1561"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}