{"id":1591,"date":"2025-05-07T10:31:31","date_gmt":"2025-05-07T08:31:31","guid":{"rendered":"https:\/\/trevigroupstg.wpenginepowered.com\/en\/media-gallery\/new-eastern-dock-project-at-port-of-naples\/"},"modified":"2025-05-30T15:20:03","modified_gmt":"2025-05-30T13:20:03","slug":"new-eastern-dock-project-at-port-of-naples","status":"publish","type":"media_gallery","link":"https:\/\/www.trevigroup.com\/en\/media-gallery\/new-eastern-dock-project-at-port-of-naples\/","title":{"rendered":"NEW EASTERN DOCK PROJECT AT PORT OF NAPLES"},"content":{"rendered":"\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p>Trevi worked at the <strong>&#8220;Darsena di Levante&#8221; Eastern Dock<\/strong> in the port of Naples to the design and realization of a new container terminal, a wide area created by filling the body of water between the two piers. From an operational point of view, the project has to face major environmental and construction challenges, due both to the position on the sea and the environmental requirements to be met. A cofferdam structure has to be constructed to the seaward and the landward side, which requires the use of some of the most cutting-edge technologies and materials existing today, from sheet piling to the consolidation of the seabed level, from low impact concreting plants to fibreglass pipes and special cements.<\/p>\n\n\n<div class=\"saz-embed-youtube embed-responsive embed-responsive-16by9\"><!-- IUB-COOKIE-BLOCK-SKIP-START --><iframe loading=\"lazy\" class=\"embed-responsive-item _iub_cs_skip\" width=\"940\" height=\"529\" src=\"https:\/\/www.youtube-nocookie.com\/embed\/v8WXaDljl0k?rel=0&amp;showinfo=0&amp;autoplay=0&amp;controls=1\" allow=\"autoplay; encrypted-media\" webkitallowfullscreen mozallowfullscreen allowfullscreen><\/iframe><!-- IUB-COOKIE-BLOCK-SKIP-END --><\/div>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Trevi worked at the &#8220;Darsena di Levante&#8221; Eastern Dock in the port of Naples to the design and realization of a new container terminal, a wide area created by filling the body of water between the two piers. From an operational point of view, the project has to face major environmental and construction challenges, due [&hellip;]<\/p>\n","protected":false},"featured_media":1592,"menu_order":180,"template":"","tipologia":[11],"class_list":["post-1591","media_gallery","type-media_gallery","status-publish","has-post-thumbnail","hentry","tipologia-video-gallery"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.trevigroup.com\/en\/wp-json\/wp\/v2\/media_gallery\/1591","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.trevigroup.com\/en\/wp-json\/wp\/v2\/media_gallery"}],"about":[{"href":"https:\/\/www.trevigroup.com\/en\/wp-json\/wp\/v2\/types\/media_gallery"}],"version-history":[{"count":0,"href":"https:\/\/www.trevigroup.com\/en\/wp-json\/wp\/v2\/media_gallery\/1591\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.trevigroup.com\/en\/wp-json\/wp\/v2\/media\/1592"}],"wp:attachment":[{"href":"https:\/\/www.trevigroup.com\/en\/wp-json\/wp\/v2\/media?parent=1591"}],"wp:term":[{"taxonomy":"tipologia","embeddable":true,"href":"https:\/\/www.trevigroup.com\/en\/wp-json\/wp\/v2\/tipologia?post=1591"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}